The Springs 47
Status
Under Construction
Project Type
Residential
Project Area
26,346.74 Sq. Ft.
Commencement date
20 May, 2020
Price Range
10M – 70M
The Smart Investment smarter Living
Total Apartments
Achieve the dream of a prestigious Gulberg address withThe Springs 47.
Project description
The Smart Investment invests with unwavering confidence in The Springs 47, a sterling opportunity secured by the proven legacy of Orbit Group. As veteran developers with a distinguished portfolio of high-rise ventures spanning numerous years, Orbit Group offers unparalleled assurance. A legacy of unblemished performance reflects our unshakeable commitment to integrity and excellence.
A synergistic team of design and execution experts meticulously crafts a project that epitomizes quality and innovation, ensuring a superior investment for discerning clientele. The Springs 47 is not merely an investment; it is a prudent acquisition, a premier destination for those seeking assured returns and enduring value.
Achieve the dream of a prestigious Gulberg address with The Springs 47. Offering beautifully finished studio, one, and two-bedroom apartments, this development promises a refined lifestyle and a wise investment for the future.
Key Details
- Location: Plot 47-B/3 Gulberg III, Lahore
- Total Built-Up Area: 350,000 sq. ft.
- Number of Floors: 20, including two underground levels for parking.
- Special Features: Vertical garden facade, collaborative workspaces, and an energy-efficient HVAC system.
- Amenities: Gym, café, daycare, and rooftop event space.
Features & amenities
24x7 Security
Round-the-clock security ensuring complete peace of mind.
Surveillance System
Advanced CCTV monitoring for enhanced safety.
Fitness Center
Fully equipped gym for a healthy lifestyle.
Children's play area
Safe and fun space for kids to play freely.
24 hour maintenance
On-call maintenance support at all times.
Swimming Pool
Refreshing pool for relaxation and recreation.
Firefighting System
Modern fire safety systems for maximum protection.
Landscape Garden
Beautiful green spaces for a calm, natural environment.
Location
address
Plot 47-B/3 Gulberg III, Lahore Pakistan
Key transport
MM Alam Road
01 Min.
Liberty Market
02 Min.
Central Business District
04 Min.
Main Boulevard Gulberg
04 Min.
Canal Road & FC College
07 Min.
Jail Road
07 Min.
DHA
10 Min.
Punjab University
10 Min.
Lahore Airport
20 Min.
M2 Motoryway
20 Min.